In November 2016, the newly-built slime drying system equipment of our company's coal preparation plant at Jinbaotun Coal Mine in Inner Mongolia has been officially put into operation. The moisture content of the feed slime is ≤35%, the moisture content of the product after drying is 15%, and the wet mud processing capacity is about 60 t/h.
In March 2015, the newly built slime drying system of our company in Shanxi Xinyuan Coal Co., Ltd. coal preparation plant has been officially put into operation. The moisture content of the incoming coal slime is 27%, the moisture content of the product after drying is 15%, and the hourly wet mud processing capacity It is 100t/h.